In reconstruction
Odesa · Odesa oblast
Transfiguration Cathedral
Phase II — dome, lantern and glazing
Mobile only
The donation flow uses a mobile wallet and is built for a phone screen. Scan the code to open this page on your device.
https://www.svitlo.fund/projects/chernihiv-transfiguration
No phone? Write to hello@svitlo.fund.

In reconstruction · Chernihiv oblast
Спасо-Преображенський собор · Chernihiv
An 11th-century cathedral, a 21st-century roof. The shell is fine. The 900-year-old plaster inside is not, and it is losing ground every time water gets in.
The Transfiguration Cathedral in Chernihiv is one of the oldest buildings in Ukraine, begun around 1030. It survived the Mongol invasion, the Soviet period and the shelling of 2022, which damaged the surrounding monastery and blew out windows in the nave.
The emergency is water. A patched roof from the 1980s is failing at the north aisle. Moisture is migrating into medieval plaster and the 19th-century wall paintings beneath it. Conservators have stabilised the worst panels; the roof has to follow.
Svitlo funds the north aisle roof, the gutters and the conservation of four plaster panels, supervised by the Chernihiv conservation workshop.
Blast damage to monastery buildings and nave windows.
Conservators stabilise the worst plaster panels.
Roof works begin; humidity loggers installed.
North aisle closed to weather; monitoring continues.
The condition survey, procurement record and completion certificates are available on request. Write to hello@svitlo.fund.