In reconstruction
Odesa · Odesa oblast
Transfiguration Cathedral
Phase II — dome, lantern and glazing
Mobile only
The donation flow uses a mobile wallet and is built for a phone screen. Scan the code to open this page on your device.
https://www.svitlo.fund/projects/kherson-catherine
No phone? Write to hello@svitlo.fund.

In reconstruction · Kherson oblast
Свято-Катерининський собор · Kherson
Shelling across the Dnipro took the cupola and the bell tower roof. Water has been getting into the dome for four winters. This is the year we close it.
Kherson has been under artillery and drone attack from positions across the river since the city was liberated in November 2022. St. Catherine’s — the city’s oldest Orthodox church, consecrated in 1786 — has been hit on the dome and the bell tower.
Temporary covers have held, but not for four winters. The cupola sheathing is failing, the timber beneath it is wet, and the bell tower roof has lost a third of its sheet metal. Every month of delay raises the conservation bill.
Svitlo is funding the cupola and bell tower: survey, timber repair, copper sheathing and a lightning protection system. The parish is providing scaffolding and labour.
No original drawing survives for this building. A measured survey is commissioned before works start; drawings are released after the heritage authority signs them off. See the drawings archive.
City liberated; first damage survey.
Temporary dome cover fails after storm.
Copper tender awarded; scaffold erected.
Target: dome closed before spring rains.
The condition survey, procurement record and completion certificates are available on request. Write to hello@svitlo.fund.